
Custom Home Building
Custom new home builds from lot review to final finish, planned for Colorado terrain.
View custom home buildingBased in Littleton, Vitanov Construction is a residential general contractor serving homeowners across the Denver metro and Colorado Front Range with custom home building, remodeling, additions, excavation, grading, drainage, and site work.
Free, no-obligation estimates. Most calls are returned the same business day.
Pick the closest match. We’ll take you to the details for that work, or straight to a free estimate request with your project type already filled in.
Ground-up builds from lot review through final walkthrough.
Digging, grading, drainage correction, and lot preparation.
Kitchens, bathrooms, basements, and whole-home renovation.
Extra square footage, second stories, and bump-outs.
Decks, fencing, retaining walls, glazing, or a repair.
We coordinate the core of the work — excavation, framing, carpentry, and finish work — using qualified subcontractors where the scope calls for it, and we directly schedule and supervise the licensed specialty trades, so your project stays with one accountable team.

Custom new home builds from lot review to final finish, planned for Colorado terrain.
View custom home building
Site prep, grading, trenching, and earth-moving with heavy equipment and surgical precision.
See excavation services
Full-home remodels, kitchens, bathrooms, basements — modernized down to the studs.
Explore remodeling
Square footage, second stories, garages, ADUs — the work that makes a property whole.
View home additionsWe are based in Littleton and work across the Denver metro and the Jefferson County foothills. Soils, terrain, and the permitting path change from one jurisdiction to the next — these pages cover what that means where you are building.
All service areas
Vitanov Construction is a Colorado-based general contractor specializing in residential home building, renovations, and excavation/dirt work — site prep, grading, trenching, full home builds and remodels, delivered clean and efficient from start to finish.
Our focus is simple: quality work, reliable timelines, and clear communication. Whether it's new construction or improving an existing home, we take pride in doing the job right.
We walk the site, listen, and scope the real work.
Detailed estimate, timeline, and material breakdown.
We run the work with a clean site and daily communication.
Final walk-through, punch list cleared, closeout documents handed over.
Permits and licensed trade work are coordinated as required by the applicable jurisdiction and project scope. Documentation relevant to your project is available on request.
Workmanship terms are set out in your contract alongside manufacturer coverage for materials. Punch list items are tracked in writing until they are signed off.
Line-item scope, allowances called out by name, and change orders priced and approved before the work happens. No lump sums, no surprise invoices at closeout.
Permits and licensed trade work are coordinated as required by the applicable jurisdiction and project scope. We schedule the inspections and carry the corrections, and we build each jurisdiction's review time into your schedule.
Daily cleanup, dust containment on interior work, protected walkways, and secure material storage. Neighbors and inspectors notice the difference.
You get a direct line to the person running your job, not a call center. Weekly progress updates with photos, and answers during working hours.
Real feedback from Colorado homeowners and clients, published on our Google Business Profile — not edited, not curated by us.
Based in Littleton and working across the Denver metro, the south suburbs, and the Jefferson County foothills. Each area page covers local soils, terrain, and the permitting path in that jurisdiction.
All service areasNo pressure, no obligation. Send a few details and we'll get back to you with next steps.
(720) 770-1039The things Colorado homeowners ask us most — permits, timelines, scheduling, and how we price the work.
We work throughout the Denver metro and Front Range, including Littleton, Denver, Highlands Ranch, Centennial, Englewood, Lakewood, Aurora, Parker, Castle Rock, Golden, and Arvada. Larger projects further out in Colorado are considered case by case.
Colorado has no single statewide general contractor license; requirements are set by each jurisdiction. Permits and licensed trade work are coordinated as required by the applicable jurisdiction and project scope. Documentation relevant to your project is available on request before work begins.
It depends on scope, structural work, material lead times, and jurisdiction review times. Every estimate we send includes a realistic schedule rather than a best-case one, and we tell you early when weather or inspections shift it.
Permits and licensed trade work are coordinated as required by the applicable jurisdiction and project scope. We coordinate with the local building department and schedule inspections at each phase. Colorado jurisdictions vary widely in requirements, and managing that is part of the job.
Estimates are free and itemized by scope, not a single lump number. Work is billed in progress draws tied to completed milestones, with the balance due after final walk-through and punch list sign-off.
/ Trusted partners
Free, no-pressure estimates across Colorado's Front Range.